Skip to content
PILLARS2026 resultsResults
Home
Bills
Recent BillsThe latest bills in Congress, in plain EnglishTrending BillsThe PILLARS Top 10 this week
Politicians
PoliticiansCongress, the White House and your repsPresidential ActionsOrders, memos and proclamationsExecutive BranchThe President, Vice President and Cabinet
Elections
Actions
More
Our SourcesWhere every number comes fromApp DetailsOur mission and the team behind itFeedbackTell us what is wrong or missingDownload the AppPILLARS for iPhone and Android
HomeRecent BillsActionsMore
ExploreElectionsPresidential ActionsPoliticiansTrending Bills
WatchlistSettingsProfile
HomeRecent BillsActionsMore
PILLARS

The bills, politicians, and elections that shape your life, in plain English.

Get the App
Our Receipts
Sources & MethodologyApp DetailsSend Feedback
The Legal Stuff
Privacy PolicyTerms of ServiceContact Us
Find Us On
© 2026 Political Pillars Inc.Simplifying politics
Eases Air Pollution Permit Rules
Recent Bills/Eases Air Pollution Permit Rules

Eases Air Pollution Permit Rules

IntroducedJanuary 3, 2025
In the House6 months ago
Intro
House
Senate
Pres
Ready for a House vote.
No date is set.
Environmental ProtectionEnvironmental assessment, monitoring, researchLicensing and registrationsEnvironmental regulatory proceduresBuilding constructionPollution liabilityAir quality
More:Bills in the HouseEnvironmentHouse Bills
Why This Matters
Right now

Under current law, any change to a factory or plant that increases its air pollution or adds new pollutants counts as a modification? under the permit program.

This bill simplifies the rules for when factories must get new permits for air pollution. It helps companies make improvements without facing heavy regulations.

If you own a factory, this bill makes it easier to upgrade equipment without needing new pollution permits.
Who this affects
factory owners · factory operators · communities near facilities
What this bill changes
  1. 1This bill clarifies when changes at factories require new air pollution permits.
  2. 2It allows certain improvements that reduce pollution without triggering strict regulations.
  3. 3The bill limits the definition of construction to only physical changes to emissions? units.

The debate

The case for

Slow, confusing permit rules discourage factories from installing cleaner equipment.

House Energy and Commerce CommitteeMajority report
vs

The case against

Changing how pollution is measured would let aging plants pollute more without permits.

Frank Pallone, Jr., Ranking MemberWritten objection

Go deeper

Read the detailed summary

New Source Review Permitting Improvement Act This bill modifies terminology for purposes of the New Source Review (NSR) permitting program of the Environmental Protection Agency (EPA). In order for a change to a stationary source to be a modification (a change to a stationary source that increases the air pollutant emissions or results in new pollutants) for purposes of the NSR permitting program, the maximum hourly emission rate achievable by such source must be higher than the maximum hourly rate achievable by such source during any hour in the 10-year period preceding the change. A change at a stationary source is not considered to be a modification under the bill if it is designed to (1) reduce the amount of any air pollutant emitted; or (2) restore, maintain, or improve the reliability of operations at, or safety of, the source. However, such changes are not excepted if the EPA determines the increase in the maximum achievable hourly emission rate from such change would cause an adverse effect on human health or the environment. Construction, in connection with a major emitting facility (a type of stationary source), does not include a change at such a facility that does not result in a significant emissions increase or a significant net emissions increase. In relation to major emitting facilities in nonattainment areas, the terms modifications and modified do not include changes at such facilities that do not result in a significant emissions increase or a significant net emissions increase.

Read full document

Last changed 2 months ago · checked hourly

Bill Progress2 of 4
A bill has to pass the House and Senate, then go to the President.
Intro
House
Senate
Pres
IntroducedJan 3, 2025
Sponsors
See all 22 sponsors
HouseCurrent

Ready for a House vote.

No date is set.

Senate
President

The President

Donald Trump
President
Not Sent Yet
Related Bills
Senate bill with the same name
Senate Bill · S 5363
1 of 4 · In Committee
New Source Review Permitting Improvement Act
Similar bill
House Bill · HR 6398
3 of 4 · In the Senate
Reducing Environmental Regulation Overlap
RED Tape Act
·Environment
Similar bill
House Bill · HR 4214
1 of 4 · Introduced
Streamlines Air Quality Permit Process
Clean Air and Building Infrastructure Improvement Act
·Environment