Skip to content
PILLARS
HomeRecent BillsActionsMore
ExploreElectionsPresidential ActionsPoliticiansTrending Bills
WatchlistSettingsProfile
HomeRecent BillsActionsMore
PILLARS

The bills, politicians, and elections that shape your life, in plain English.

Get the App
Our Receipts
Sources & MethodologyApp DetailsSend Feedback
Browse Bills
Bills That Became LawPassed the HousePassed the SenateBills by Topic
The Legal Stuff
Privacy PolicyTerms of ServiceContact Us
Find Us On
© 2026 Political Pillars Inc.Simplifying politics
Columbia River Power System Operations Bill
Recent Bills/Columbia River Power System Operations Bill

Columbia River Power System Operations Bill

IntroducedJanuary 22, 2025
Introduced1 year ago
Intro
House
Senate
Pres
Referred to the Subcommittee on Water Resources and Environment.
More:Recently Introduced BillsEconomyHouse Bills
Why This Matters

This bill outlines how the Columbia River Power System should be managed and allows for changes if necessary for safety. It ensures that electricity generation remains a priority while allowing for necessary updates and maintenance.

If you depend on electricity from the Columbia River, this bill aims to ensure reliable power generation.
Who this affects
communities · businesses
What changes is this bill making?
  1. 1This bill requires the government to operate the Columbia River Power System according to a specific plan.
  2. 2The bill allows government officials to make changes to this plan for safety or reliability reasons.
  3. 3It prevents any changes that would reduce electricity generation at hydroelectric dams without new federal approval.
  4. 4The bill clarifies that maintenance and improvements can still be made to the power system.
Read the detailed summary

Northwest Energy Security Act This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho. Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Power Administration, and the Army Corps must follow the EIS rather than the 2023 Resilient Columbia Basin Initiative—and a supplemental EIS proposed in 2024—that focus on wild fish restoration in the Columbia Basin. The EIS decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary. Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.

Bill Progress1 of 4
Bills must pass the House, Senate, and be signed by the President to become law.
Intro
House
Senate
Pres
IntroducedCurrentJan 22, 2025

Referred to the Subcommittee on Water Resources and Environment.

Sponsors
See all 4 sponsors
House
Senate
President

The President

Donald Trump
President
Awaiting Vote
Similar Bills
House Bill · HR 3628
3 of 4 · Passed House
Reliable Electric Generation Bill
State Planning for Reliability and Affordability Act
·Economy
House Bill · HR 2074
1 of 4 · Introduced
Protecting Dams and Energy Resources
POWER Act
·Environment
House Bill · HR 3843
1 of 4 · Introduced
Electricity Supply Protection Bill
Baseload Reliability Protection Act
·Economy